Special Investment Region · Gujarat

India's first greenfield smart city.

0 sq.kmSmart City
$0B+Investment
2×Size of Mumbai
#0Platinum Rated
0SIR Act Year

Overview

A city, by design.

Most of India's cities grew accidentally. Dholera is the opposite designed before it was built, built before it was sold.

DHOLERA SIR is the first node of the Delhi-Mumbai Industrial Corridor (DMIC) and India's first platinum-rated greenfield smart city. It's not a retrofit of an existing town it's an entirely new urban region planned from a blank canvas, with its own master grid of expressways, metro alignment, airport, and trunk infrastructure laid down before any residential or commercial plots were sold.

This sequence infrastructure first, plots second is what separates Dholera from every other "smart city" project in India. By the time a buyer takes possession, the road, drainage, fibre, and power are already there.

Backed by the Special Investment Region Act 2009 and a joint venture between the Government of India and the Government of Gujarat, Dholera has already attracted over $20 billion in committed investment across manufacturing, semiconductors, renewables, and urban infrastructure.

Dholera SIR
22°N, 72°E · Gujarat

Why It's Different

Eight things to know.

The signal that separates Dholera from the noise of "smart city" announcements the structural facts that make it a uniquely durable long-term thesis.

01
$20B+

Global investment committed.

Cumulative international and domestic investment already secured for Dholera SIR's infrastructure, manufacturing, and renewable energy build-out including major semiconductor and EV component anchor tenants.

02

India's first platinum-rated greenfield.

Built ground-up to IGBC platinum standards. No retrofitting of an existing urban core every road, pipe, and grid is new.

03

SIR Act 2009.

First and only city in India under the Special Investment Region Act a regulatory framework that streamlines approvals and protects investors with statutory backing.

04

Government JV.

Joint venture between Government of India and Government of Gujarat DMICDC-led execution.

05

China +1.

Positioned to be the world's largest manufacturing hub under the China+1 strategy, with semiconductor and EV anchors.

06

Pollution-free.

Designed to be the world's largest pollution-free industrial hub, with strict zero-discharge norms.

Master Plan

The grid that runs the city.

Dholera's master plan divides 920 sq.km into precisely zoned residential, commercial, industrial, and recreational areas connected by a central spine of expressways, metro, and trunk utilities.

Dholera Master Plan

Industrial Zone

Manufacturing, semiconductors, electronics. Anchored by major global tenants.

~30%

Residential Zone

Master-planned residential plots, apartments, and gated villa communities.

~22%

Central Business District

Commercial hub,Tata Semicon Plant, civic facilities, and city centre retail.

~5%

IT & Knowledge Hub

Office parks, data centres, R&D campuses, and educational institutions.

~12%

Recreational & Green

Public parks, lakes, sports facilities, and ecological reserves.

~18%

Logistics & Warehousing

Trucking corridors, container yards, and supply-chain infrastructure.

~13%

Connectivity

Connected on every axis.

Road, rail, air, and sea Dholera is being woven into India's main transport arteries from day one, not as an afterthought.

Dholera Connectivity Map

Dholera Ahmedabad Expressway

Prime Connectivity Corridor

Dholera International Airport

Upcoming International Hub

Lothal Museum

Historic Heritage Site

Kashbhanjan Hanuman Temple

Spiritual Landmark

Piple Fedra State Highway

Direct Road Connectivity

Touching

Anchor Infrastructure

Five pillars, already underway.

The mega-projects already breaking ground what they unlock and why they matter for plot value.

01
Tata Semicon Plant at 1st no.

Tata Semicon Plant

The Administration & Business Centre Dholera's iconic civic landmark and the seat of governance.

02
Expressway

Six-lane Expressway.

109 km direct expressway from Ahmedabad under construction, slashing travel to under 90 minutes.

03
Metro Train

Metro Train.

High-speed metro alignment connecting Ahmedabad-Dholera commercial hubs and major residential nodes.

04
Airport

International Airport.

A dedicated greenfield international airport within Dholera SIR the gateway to global trade.

05
Solar Park

Largest Solar Park.

One of Asia's largest solar parks Dholera's clean-energy backbone, powering the city's industrial future.

Phased Rollout

Built in phases.

Dholera SIR is being developed in phases each one unlocking new investment value as infrastructure goes live and anchor tenants take possession.

2009
SIR Act

Gujarat passes the Special Investment Region Act the legal framework for Dholera as India's first SIR.

2014–22
Foundation

Master plan finalised, land acquisition completed, anchor infrastructure (roads, water, power) construction begins.

2023–26
Activation

Phase 1 (22.5 sq.km) goes live. Expressway,Tata Semicon Plant, semiconductor fab, and solar park become operational.

2027+
Scale-up

Metro & airport commissioning, residential occupancy ramps, anchor manufacturing tenants begin production.

Common Questions

Things investors ask.

The questions we get most often answered straight, without sales-speak. Have something specific? Reach out anytime.

Ask Us Directly
Dholera SIR is in the Ahmedabad district of Gujarat, approximately 100 km south-west of Ahmedabad city. It spans 920 sq.km along the Gulf of Khambhat coast making it roughly twice the geographic size of Mumbai.
The Special Investment Region Act, 2009 is Gujarat-specific legislation that creates a unified regulatory and approvals framework for large-scale industrial regions. Dholera is the first and currently only city operating under this Act meaning faster approvals, statutory backing, and a single-window investor protection regime that doesn't exist for ordinary city expansions.
Yes. NA-approved residential plots are actively being sold in private plotted developments adjacent to and within Dholera SIR. Phase 1 of the city is already partly operational, and master-plan zoning for residential blocks is locked in. Pronest only sells plots that have NA approval, all NOCs, and clear, legally verified titles.
"China+1" describes the global manufacturing strategy of diversifying supply chains away from over-reliance on China. India is the leading beneficiary, and Dholera SIR with its semiconductor fab, EV component ecosystem, and dedicated industrial zoning is being positioned as India's largest single-site manufacturing hub for that diversification.
Land value in greenfield smart cities historically follows infrastructure milestones expressway commissioning, metro launch, airport activation, and major anchor-tenant occupancy. As each milestone is reached, corridor-adjacent and master-plan-adjacent plots typically re-rate. Past performance isn't a guarantee, but the structural setup at Dholera mirrors the early-stage stories of Gurgaon and Navi Mumbai at scale.
Yes. Dholera SIR has a dedicated greenfield international airport planned within its boundary currently under construction. It is intended to serve as both a passenger and cargo gateway for the industrial and residential ecosystems Dholera is building.

Get Started

Ready to own a piece of Dholera?

Schedule a site visit, request a master plan brochure, or speak with our team about which plots align with your investment horizon.

Reach Us

Office
1222, 12th Floor, Shivalik Shilp,
Iskon Ambli Junction, Ahmedabad

G 92, G Block,
Sector 63, Noida
Phone
+91 1800 21 21 21 22
Email
support@pronestinfra.com